This Waitangi Weekend we will be running our normal first Sunday of the month Big Steam Sunday on the 5th and after the successful Wellington Anniversary day run, we have decided to run Fowler #5 on Monday the 6th. Two days of steam with 2 different locomotive. Bring a picnic and spend a day with the family riding behind our locomotives.
Rm5
Built in 1936, Rm 5 was one of 6 Wairarapa Railcars principally designed for use over the steep Rimutaka Incline railway between Upper Hutt and Featherston. The section between Summit and Cross Creek used the Fell Centre Rail for adhesion and braking. As this rail sat up higher than the running rails the car was designed to clear it. Originally powered with a Leyland petrol engine this was later changed to a Leyland diesel to lessen the fire risk. Mainly used between Wellington and Masterton the Wairarapa railcars did occasionally venture further afield to places like Gisborne. After the Rimutaka Incline was closed in 1955, being replaced by an 8.8km long tunnel, the 6 Wairarapa railcars were withdrawn.
Stored at Hutt workshops along with several sisters Rm 5 along with 3 others were purchased by the Wellington Branch of the New Zealand Railway and Locomotive Society (later Silver Stream Railway). Moved a short distance up the Gracefeild branch line and later Seaview, Rm5 was chosen as being the one in the best condition structurally and mechanically and a start made on returning it to operation. The “Flying Tarpaulin” as it became know was a popular attraction at open days at the Seaview site. The bodywork being covered in tarpaulins due to its poor condition. It was moved by road to the Silverstream site in 1980 where work continued on improving its condition.
An approach by the newly formed Pahiatua Railcar Society in the early 1990s, to restore Rm5 to mainline running standards saw the car head to Pahiatua in 1992 on lease. Here major progress has been made, with the timber framed body work being completely replaced with a new steel frame and work is currently focusing on cladding and lining. This project continues to make good progress with completion not too far away.




